Service description
Quality and certifications
Certifications defined on the company profile (read-only)
- ISO 9001
- TSE
- TSEK
- TSE Service Competence Certificate
More services from this company
Karsan Raf Sistemleri (ayc)
Installation and Handover
Warehouse Systems ServiceKARSAN installs with its own crew. Upright plumb, beam locks, anchors and base plates are checked during fit-up. Parts are made in the Konya plant—from cutting and bending through welding and powder coating—then erected on site; production stays in Konya while installation covers Turkey nationwide. At handover, the permitted load for each bay is left in writing so capacity labels are clear and later inspection, repair or spare-part requests stay with the same technical team. Central Anatolia and the Mediterranean corridor are frequent zones, with national coverage available.
Konya
Karsan Raf Sistemleri (ayc)
Rack Inspection, Repair and Spare Parts
Warehouse Systems ServiceIn-service inspections check upright and beam damage, missing safety pins, loose anchors and unlabelled bays, documented with photos. Following EN 15635 practice, damage is graded light, medium or severe; severe bays must be emptied and marked. Struck uprights, bent beams or broken base plates are replaced on site—damaged parts are not straightened for reuse. Uprights, beams, pins, base plates, anchors, mesh decks, pallet supports and column/corner protectors are made in-house so matching spares come from stock or short production. Relocations include dismantling, re-planning and re-erection; adding levels or changing bay heights triggers a fresh capacity calculation.
Konya
Related services
Depota Raf Sistemleri İnş. İth. İhr. San. ve Tic. Ltd. Şti.
Racking Installation
Warehouse Systems ServiceRacking installation covers erecting the manufactured system on site, anchoring it to the floor and handing it over ready for use. Installation follows the layout approved at the design stage. The sequence is site preparation, a parts count after delivery, setting out, upright and beam assembly, floor fixing, and vertical and horizontal checks. Bracing and bolt tightness are reviewed before handover. In a warehouse that stays in operation, installation proceeds zone by zone. For projects in Ankara the crew is in the same city; elsewhere in Turkey, shipment and installation are planned according to project size.
Ankara
Depota Raf Sistemleri İnş. İth. İhr. San. ve Tic. Ltd. Şti.
Racking Design
Warehouse Systems ServiceRacking design determines how the warehouse will be laid out before a purchase decision. The area is measured on site; column spacing, ceiling and beam heights, door and shutter positions and floor condition are recorded. Aisle and bay layout follows product weight and size, how often goods are picked, and whether a forklift, pallet truck or reach truck is used. The plan is drawn, a three-dimensional view can be prepared on request, and production starts after approval. Survey, measurement and the layout plan are free of charge. The service is used for warehouses, archives, production plants, store back rooms and high-ceiling buildings.
Ankara
Depota Raf Sistemleri İnş. İth. İhr. San. ve Tic. Ltd. Şti.
Racking Dismantling and Reinstallation
Warehouse Systems ServiceBolted, modular racking can be dismantled and reinstalled at another address. When a warehouse moves, the existing system is inventoried, parts are grouped and marked during dismantling, and damaged components are set aside. A survey is made for the new warehouse; if the dimensions differ, the layout is redrawn, and the same system may not be rebuilt in exactly the same arrangement in another building. Missing or damaged parts can be remade in the same profile. For businesses changing warehouse, this keeps the investment in the system.
Ankara
Eksen Raf
Racking Installation and Assembly
Warehouse Systems ServiceThe installation crew carries out assembly on site, including intercity projects. Racking systems are delivered across Turkey with installation included. Heavy-duty racks are fixed to the floor with steel anchors; under the occupational safety regulation the top of the rack is also tied to the floor through seismic bracing. The systems are demountable and can be dismantled and reinstalled in another location without compromising the structure. Typical lead time is 2–3 weeks for heavy-duty projects and about 8 weeks for clad rack buildings.
İstanbul