Service description

Bolted, modular racking can be dismantled and reinstalled at another address. When a warehouse moves, the existing system is inventoried, parts are grouped and marked during dismantling, and damaged components are set aside. A survey is made for the new warehouse; if the dimensions differ, the layout is redrawn, and the same system may not be rebuilt in exactly the same arrangement in another building. Missing or damaged parts can be remade in the same profile. For businesses changing warehouse, this keeps the investment in the system.

Quality and certifications

Certifications defined on the company profile (read-only)

Full company profile
  • ISO 9001
  • TSEK

More services from this company

Related services

Racking Installation — Depota Raf Sistemleri İnş. İth. İhr. San. ve Tic. Ltd. Şti.

Depota Raf Sistemleri İnş. İth. İhr. San. ve Tic. Ltd. Şti.

Racking Installation

Warehouse Systems Service

Racking installation covers erecting the manufactured system on site, anchoring it to the floor and handing it over ready for use. Installation follows the layout approved at the design stage. The sequence is site preparation, a parts count after delivery, setting out, upright and beam assembly, floor fixing, and vertical and horizontal checks. Bracing and bolt tightness are reviewed before handover. In a warehouse that stays in operation, installation proceeds zone by zone. For projects in Ankara the crew is in the same city; elsewhere in Turkey, shipment and installation are planned according to project size.

Ankara

Racking Design — Depota Raf Sistemleri İnş. İth. İhr. San. ve Tic. Ltd. Şti.

Depota Raf Sistemleri İnş. İth. İhr. San. ve Tic. Ltd. Şti.

Racking Design

Warehouse Systems Service

Racking design determines how the warehouse will be laid out before a purchase decision. The area is measured on site; column spacing, ceiling and beam heights, door and shutter positions and floor condition are recorded. Aisle and bay layout follows product weight and size, how often goods are picked, and whether a forklift, pallet truck or reach truck is used. The plan is drawn, a three-dimensional view can be prepared on request, and production starts after approval. Survey, measurement and the layout plan are free of charge. The service is used for warehouses, archives, production plants, store back rooms and high-ceiling buildings.

Ankara

Racking Installation and Assembly — Eksen Raf

Eksen Raf

Racking Installation and Assembly

Warehouse Systems Service

The installation crew carries out assembly on site, including intercity projects. Racking systems are delivered across Turkey with installation included. Heavy-duty racks are fixed to the floor with steel anchors; under the occupational safety regulation the top of the rack is also tied to the floor through seismic bracing. The systems are demountable and can be dismantled and reinstalled in another location without compromising the structure. Typical lead time is 2–3 weeks for heavy-duty projects and about 8 weeks for clad rack buildings.

İstanbul

Static Calculation and Earthquake Report — Eksen Raf

Eksen Raf

Static Calculation and Earthquake Report

Warehouse Systems Service

Mezzanine projects include a load calculation per square metre and a static calculation. For clad rack systems, static calculations, earthquake-code requirements and wind loads are built into the design from the outset. A soil survey is required before installation, and the foundation design follows the soil report. For heavy-duty racking, a seismic calculation and an earthquake report are supplied on request. On clad-rack projects that need a building permit, the required technical documents are prepared.