System Boya
System Boya has applied electrostatic powder coating since 2000, under this name since 2010; it coats metals up to 14 metres and runs Monday–Saturday 24 hours.
About
After serving in the electrostatic powder-coating sector since 2000, we began operating under the name "System Boya" in 2010. With that service we rose to a respected position in electrostatic powder coating in a short time.
With the four branches we opened in 2011, 2012 and 2013 we aim to grow with firmer steps. You may contact our references to be sure of our quality.
Surface-coating processes exist for all kinds of metal before electrostatic powder coating; our plant is suitable for coating heavy and unfolded machine parts, and can coat materials up to 14 metres in length.
Working hours are Monday–Saturday, 24 hours.
Production profile
Company type
Activity types
Production capabilities
Materials worked
Manufacturing processes
Industries served
Activity categories
Factory gallery
Products
Wrought-iron door and window powder coating
The services page lists wrought-iron door powder coating, static powder coating, electrostatic powder coating and wrought-iron window coating. The About page states that surface coating of all metals exists before electrostatic powder coating, and that the plant can coat heavy unfolded machine parts and materials up to 14 metres. Trading under the System Boya name began in 2010; sector service dates from 2000.
Machine-part powder coating
The services page lists machine painting, machine-part painting, powder coating and electrostatic powder coating of machines and parts in Istanbul. About states the plant is suitable for heavy unfolded machine parts and coats materials up to 14 metres. Four branches opened in 2011–2013 are named as the growth target.
Metal panel and stand powder coating
The services page states that static and electrostatic powder coating of metal panels and stands is done in Istanbul. About notes metal surface coating before electrostatic powder coating and suitability for materials up to 14 metres. Working hours Monday–Saturday 24 hours are on the same About page.
Services
Electrostatic powder coating
The About page: after service in electrostatic powder coating since 2000, activity under the System Boya name began in 2010. The plant can coat heavy unfolded machine parts and materials up to 14 metres. Surface coating of all metals exists before powder coating. Hours are Monday–Saturday, 24 hours.
Scaffold and formwork powder coating
The services page lists coating of construction scaffolding and formwork in Istanbul: painting, powder coating, static and electrostatic powder coating. About states suitability for materials up to 14 metres and metal surface coating before powder coating. Sector service from 2000; System Boya name from 2010.
Shutter and lift-cabin powder coating
The services page lists static/powder/electrostatic coating of automatic doors and shutters, and painting/powder/electrostatic coating of lift cabins and lift parts. About states metal surface coating and capacity up to 14 metres. Sign, totem and advertising-product powder coating is on the same services list.